The questions engineers ask before they commit

Lead times, DFM checks, tolerance limits, inspection reports and maintenance schedules — written from the jobs we quote, with the numbers we actually work to.

These guides exist because the same questions come up in every enquiry: how long a tool really takes, what a drawing is missing, which tolerance a process can hold, what an inspection report should contain and when a mold needs servicing. Each guide answers one question, states its figures as ranges where they vary, and points to the page that holds the detail.

Guides

Start with what you are deciding

Mold being machined on a CNC milling centre

Tooling · 8 min read

How long does it take to build an injection mold?

Stage-by-stage timings for a 2-plate, 3-plate and hot-runner tool, which stages actually drive the date, and why a 25-day quote and a 45-day quote can both be honest.

  • Stage table with day ranges
  • What makes a schedule slip
  • How to read a mold quote timeline
Read the guide
Engineer reviewing a part drawing on screen

Design · 7 min read

The DFM checklist to run before steel is cut

Wall thickness, draft, ribs, bosses, gate position and shut-off — the checks that cost nothing before the tool is built and a great deal after.

  • Twelve-point review list
  • Which findings change tool cost
  • What to send with the drawing
Read the guide
Machined metal part being measured with a micrometer

Machining · 9 min read

What tolerance can CNC machining hold?

Typical achievable tolerance by feature and process, the difference between a drawing tolerance and a real capability, and the features that quietly add cost.

  • Tolerance table by feature
  • Why thin walls move
  • When to specify surface roughness
Read the guide

How to use these guides

If you are at the quotation stage, read the lead-time and DFM guides together — the first tells you what the schedule depends on, the second tells you which drawing details change it. If you are checking a supplier, read the inspection report guide and then ask for a real report to compare against it.

Which guide answers which question
Your questionGuideAlso see
How long will the tool take?Injection mold lead timesMold making
Is my design ready for tooling?DFM checklistPrototype tooling
Can this tolerance be machined?CNC tolerance guideCNC machining
What should an inspection report show?CMM & FAI explainedQuality
When should the tool be serviced?Maintenance scheduleInjection molds
Who writes these guides?

They are written from our own quotation, toolmaking and inspection work, and reviewed by the engineers who run those jobs. Where a figure is a typical range rather than a fixed value, the guide says so.

Can I reuse these guides internally?

Yes, for internal training and supplier discussions. Quote them with a link back to the page rather than copying them wholesale into public material.

Will you write about a specific problem we have?

Often, yes — a question that keeps arriving from several customers usually becomes a guide. Send it through the contact page with enough context to make the answer useful.

Ask the question behind your question

If a guide stops short of your case, send the drawing and describe the constraint. We will answer directly rather than pointing at a page.

Talk to an engineer